The major duties and responsibilities of Zhuhai EPB are:

(I) To implement the state policies, guidelines, laws, and regulations concerning environment protection; to work out the municipal laws, regulations …
 
 

Procedures for Environmental Assessment on Constructional Projects by Zhuhai Environment Science Research Institute


I. Information Materials to Be Provided
(I) Letter of Authorization
(II) Documents Concerning Project Approval
(III) Contract of Renting
(IV) License of Land-Use for Constructional Project
(V) Letter of Approval for Land-Use for Constructional Purpose
(VI) Geographical Location Map
(VII) Set-in Line Drawings
(VIII) Feasibility Study Report
(IX) Initial Designing of Project or Related Descriptions
(X) Overall Layout Plans and Related Drawings
If there is no "Feasibility Study Report" and "Descriptions on Project Designing", the following information should be provided in written form:
1. Contents and scale of the project: land coverage, construction space area, landscaping space area, total investment and investment on environment protection, technological processes, production scale (names, quantities of products), list of raw materials and auxiliary materials (names and quantities), list of major equipment (names, models, powers, noise indexes, etc.);
2. Information about "water":
1) Total water supply volume (ton/day), recycling water volume (ton/day);
2) Total drainage (including household sewage, industrial waste water, cooled water) (ton/day), preventive measures and efficiency for sewage and waster water treatment;
3. Information about "air":
1) Models, evaporation capacities and numbers of quantity for power generators, boilers, fuel furnaces, ovens, etc; quantities of fuel consumption and gas consumption (ton/h or m3/h); height of chimneys (m), diameters of outlets (m), exhaust temperature at outlet (0C), flow-rate at outlet (m/s), exhaust discharge volume (m3/h), smoke and dust discharge volume (kg/h), measures and efficiencies for smoke/dust elimination (%).
2) Type and quantity of generation (ton/day, or kg/h) of production air exhausts and dust, efficiency of preventive measures (%).
4. Information about "residues":
Type, quantity and disposal method for solid wastes and sludge.

II. Flowchart for assessment on environmental impacts of constructional projects

Department undertaking procedures: Zhuhai Environment Science Research Institute Tel: 2220144

Remarks:
After the environment survey organization accepts the compliant registration, it usually takes 3 working days prior to the field investigation and handling. In the case that some special situations delay the handling, the delay should be no more than 7 working days, which also necessitates some reasonable explanations.
Tel for Complaints: 2221734, 2256124



2001.5起访问
总数:54434

Copyright 2002-2003 ZhuHai Enviornmental Protection Bureau All Rights Reserved.
TEL:2257114 FAX:2250522 E-mail:webmaster@zhepb.gov.cn
 Design by TianHui

Notes to
the updating of data.